top of page
IMG_0363_edited.jpg

Cultana Solar Project

IMG_3832.JPG

Succession Ecology worked closely with SIMEC Energy Australia to determine effective site preparation and dust management strategies for a 280 MW solar project in arid South Australia.

​

Services included:

  • Vegetation surveys

  • Soil chemistry tests and reporting

  • Seedbank assessments and reporting

  • Vegetation flattening trial and reporting for dust suppression

​

SIMEC Energy Australia reported that "As part of on-site pre-works, SIMEC Energy Australia also worked with Succession Ecology Australia to conduct a rolling trial on the site vegetation, designed to provide even further benefits for vegetation and dust suppression" ‒ see their full media report here

IMG_3654_2_small.jfif
Arid_work_RS_jj.jpg
Rolling_c_RS.jpg
IMG_3652_small flp.jfif
bottom of page